Project Update:

April 18th, 2018

The rock layer for the roadway was placed this week along with most of the topsoil on the slopes.  Crews also worked on the stretches of roadway on the upper and lower limits of the repair section, grinding the existing surface and making spot repairs in preparation for paving.  Next week the curb and gutter will be installed.  The wet weather and excessive ground moisture continues to have an impact on schedule. The "open to traffic" date is trending toward the first week in May.  (The photo above was taken 4/02/18.)


April Schedule.jpg
More Construction Photos

Resources

Project Summary:

The 212th Way SE project is a repair and rehabilitation project to stabilize the road embankment.  The section requiring stabilization is approximately 2,800 feet in length starting near 212th Ave SE at the top of the hill and extending southwest.

The project includes a full reconstruction of the road through the embankment stabilization section - including two travel lanes, paved shoulders, curb and gutter, a storm water system.  The remaining 1,400 feet length between East Lake Sammamish Parkway and stabilization portion will not be reconstructed but will receive a new pavement surface and new guardrail.


Public Involvement

An open house meeting was held June 11, 2015 to discuss the project.
Public Meeting Postcard Mailing for 212Wy Jun 2015

Below is a compilation of comments from the meeting.
212th Way 061115 Open House Comments.pdf

A construction site tour was provided on November 11, 2017 to give residents the opportunity to observe the construction progress.

News releases

No articles found